Aptitude - Time And Work
A man can do a job in 15 days. His father takes 20 days and his son finishes it in 25 days. How long will they take to complete the job if they all work together?
A train 150 meters long running at a speed of 60 kmph takes 30 seconds to cross a bridge. The length of the bridge is,
A jogger running at 9 kmph alongside a railway track is 240 meters ahead of the engine of a 120 meter long train running at 45 kmph in the same direction. How much time will the train pass the jogger?
A train runs at the speed of 72 kmph and crosses a 250 m long platform in 26 seconds. What is the length of the train?
16 men can complete a work in 35 days. In many days can 28 men complete the same piece of work?
Comments
Post a Comment